Juneau Office: (907) 780-4004
Douglas 4th Street, D to F

Douglas 4th Street, D to F

proHNS is providing project management and design services for a street reconstruction and utility replacement project spanning D, E, and F Streets on 4th Street. This section of road was selected for reconstruction based on an in-depth utility condition analysis that...
Misty Lane

Misty Lane

proHNS conducted public outreach and designed roadway and utility improvements to Misty Lane, a 320-foot stub street dead-ending in a cul-de-sac in North Douglas’ Bayview subdivision. During the project’s construction, proHNS provided construction administration...
Bonnie Brae Pump Station

Bonnie Brae Pump Station

proHNS designed and inspected the renovation of this water booster pump station that supplies municipal water to Juneau’s Bonnie Brae Subdivision.  The renovated station features two new 3-hp pumps and a new 30-hp pump to supply water during high demand periods...
Haines Flood Repairs

Haines Flood Repairs

proHNS is currently designing the reconstruction of several Haines Borough roadways and culverts that were severely damaged during a December 2020 storm event. Our scope of engineering services for this work includes providing surveying, civil-site, utility design,...
Calhoun Avenue

Calhoun Avenue

Calhoun Avenue is a historic road in Alaska’s capital city that connects downtown Juneau to the state’s Governor’s Mansion and continues to recreational parks and residential neighborhoods. proHNS planned this road reconstruction project into two phases, spread out...
Douglas 4th Street

Douglas 4th Street

proHNS deftly designed this complicated utility and drainage  improvement project, which will replace multiple underground water transmission and distribution pipe networks with new 10” and 14” HDPE pipe, water services, and hydrants. Work will also include...
Small Tracts/Mud Bay/Third Ave

Small Tracts/Mud Bay/Third Ave

proHNS designed this Haines Borough project that replaced 2,891 feet of asbestos and ductile iron water line with HDPE pipe. In addition to installing a new water main, sewer services, water services, hydrants, and valves, the project also replaced the road base and...
Savikko Road

Savikko Road

proHNS designed and inspected this CBJ project that replaced the failing water line, reconstructed the road base and pavement, and upgraded drainage and sewer utilities. Lead Design Engineer Lucas Chambers conducted numerous site visits and an on-site scoping meeting...
Front Street Water Line

Front Street Water Line

This project, funded by an Alaska Department of Environmental Conservation Drinking Water Fund loan, replaced 420 linear feet of existing 4-inch diameter asbestos cement (AC) water line with HDPE pipe. Our subcontractor North 57 Land Surveying provided survey while we...
Lee Street Pump Station

Lee Street Pump Station

As the prime consultant, proHNS is providing civil engineering design for this CBJ project that will upgrade the Lee Street pump station to maintain operating pressure and provide fire flow to a nearby subdivision. While our subcontractor Haight & Associates...
Sitka Street

Sitka Street

This project offered proHNS another opportunity to see a CBJ project from start to finish, providing both design and CA/I services. The primary purpose of this project was to replace Sitka Street’s dilapidated and failing water main, though other improvements included...
D&H Streets Douglas

D&H Streets Douglas

This was proHNS’s first opportunity to provide both design and CA/I services on a single CBJ project, allowing us to analyze which design aspects worked (and which fell short) during construction. D&H Streets rehabilitated the existing pavement surface, improved...