proHNS designed roadway and utility improvements to Misty Lane, a 320-foot stub street dead-ending in a cul-de-sac in North Douglas’ Bayview subdivision. Design elements included: 1) Full water system reconstruction with new 8” HDPE water main line, 1” poly water services with new valve boxes, and new fire hydrant with galvanic anode; 2) Removal and replacement of the existing sewer lift station, and replacement of existing sewer manhole frames and lids; 3) Removal of existing asphalt pavement and road base, placement of 9.5” of new 2” minus shot rock capped with D-1, and placement of 2.5” of new asphalt pavement; and 4) Replacement of CMP culverts with CPP culverts correctly sized for drainage flows. Construction is scheduled to begin Spring 2023, when proHNS will also provide contract administration and inspection services on behalf of CBJ.