2020 Area Wide Paving

Location: Juneau, AK Project Complete: 2021 Owner: City and Borough of Juneau proHNS managed and inspected this project that made varying levels of improvement to seven CBJ roadways. We successfully worked around the Contractor’s irregular, unpredictable schedule of paving one street at a time as “fill-in” jobs between other projects. Our inspector navigated the different challenges presented by each roadway, including working with the paving Contractor to ensure a clean, smooth radius that...
Read More

Douglas 4th Street Douglas Utilities and Drainage

Location: Juneau, AK Project Dates: 2020 - Present Owner: City and Borough of Juneau proHNS deftly designed this complicated utility and drainage  improvement project, which will replace multiple underground water transmission and distribution pipe networks with new 10” and 14” HDPE pipe, water services, and hydrants. Work will also include installation of temporary water systems to maintain service to the high pressure transmission network between PRVs, and temporary water systems to maint...
Read More

Tenakee Ferry Terminal Improvements

Location: Tenakee Springs, AK Project Dates: 2020 Owner: AK DOT&PF proHNS provided a full team to perform contract administration and inspection services for all work on this $11.2 million project that reconstructed the existing Tenakee city dock and DOT&PF ferry terminal facility. Construction included removal of portions of the existing dock and terminal structures, refurbishment of the existing pile support approach deck, improvements to fuel and electrical systems, and constru...
Read More

Ketchikan Airport Creek Bridge Replacement

Location: Ketchikan, AK Project Dates: 2019 Owner: AK DOT&PF This FHWA-funded AK DOT&PF project replaced an existing temporary bridge structure across Airport Creek on Lewis Reef Road with a new, two-lane concrete bulb tee girder bridge with a finished width of 39 feet. Improvements included realignment of Lewis Reef Road and modifying the approach intersection of Bostwick/Seely Road. The concrete bridge abutments were Cast-In-Place (CIP) atop steel H-piles rock socketed into be...
Read More

Small Tracts/Mud Bay/Third Avenue AC Pipe Replacement

Location: Haines, AK Project Dates: 2019-2020 Owner: Haines Borough proHNS designed this Haines Borough project that replaced 2,891 feet of asbestos and ductile iron water line with HDPE pipe. In addition to installing a new water main, sewer services, water services, hydrants, and valves, the project also replaced the road base and pavement. proHNS also provided contract administration and inspection services during the three-month construction season. As the project was partially fund...
Read More

Egan Drive 10th Street to Main Street Improvements

Location: Juneau, AK Project Dates: 2019-Present Owner: AK DOT&PF proHNS is providing a team of experienced Project Engineers, Office Engineers, and Engineering Technicians to provide contract administration and inspection services for this high-profile, logistically challenging road improvement project in downtown Juneau. The 2019 construction season is focusing on the highly trafficked stretch of Egan Drive between Willoughby and Whittier Streets, necessitating complex coordinatio...
Read More

Calvary Fellowship Subdivision

Location: Juneau, AK Project Dates: 2017-2019 Owner: Southeast Endeavors proHNS designed this 8-lot subdivision on behalf of Southeast Endeavors, and subsequently provided construction inspection services under our three-year CBJ term agreement. Our Lead Designer Lucas Chambers worked on this project from start to finish. Beginning in 2017, Lucas designed and modeled the new road, lot layout, driveways, and water and sewer facilities servicing the new lots. He also designed an extension...
Read More

Spaulding Beach Parking Lot Reconstruction

Location: Juneau, AK Project Dates: 2018 Owner: Spaulding Beach Homeowners Association proHNS provided contract administration and inspection services on behalf of the Spaulding Beach Homeowners Association for this $240,000 parking lot reconstruction project. Our services included preparation of contract documents, project management, daily field inspection, cost tracking, stakeholder coordination, and documentation of Contractor G.R. Cheeseman's progress. At the Owner's request, proHN...
Read More

Sitka Street Reconstruction

Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau proHNS handled primary engineering design, research, analysis, and technical specification writing for this City and Borough of Juneau project that replaced Sitka Street's dilapidated and failing water main. Other improvements included storm drainage collection upgrades and replacement of the aging pavement section between North Douglas Highway and Nowell Avenue. Design elements included new concrete valley gu...
Read More

West Eighth Street Reconstruction

CBJ West Eighth Street Reconstruction
  Location: Juneau Project Dates: 2017 Owner: City and Borough of Juneau proHNS provided construction contract administration and inspection services for CBJ’s West 8th Street Reconstruction project, extending from ADOT’s Egan Drive to the new Whale Park. The project improved storm drainage, updated and replaced water and sewer systems, installed curb and gutter, and reconstructed the roadway typical section. Connection to the existing water main along Egan Drive was performed under an A...
Read More