Juneau Office: (907) 780-4004

Location: Haines, AK
Project Dates: 2019-2020
Owner: Haines Borough

proHNS designed this Haines Borough project that replaced 2,891 feet of asbestos and ductile iron water line with HDPE pipe. In addition to installing a new water main, sewer services, water services, hydrants, and valves, the project also replaced the road base and pavement. proHNS also provided contract administration and inspection services during the three-month construction season. As the project was partially funded by an Alaska Drinking Water Fund loan, contract administration included ensuring work adhered to all state and federal requirements (American Iron and Steel, DEC testing, wage rates, etc.) so as not to jeopardize funding.