Kensington Back Dam, Stage 4A

Kensington Back Dam, Stage 4A

The remote Kensington Mine is located 45 miles north-northwest of Juneau, Alaska, with access only via a small plane or boat. The active approximately 240-acre gold mine also houses a tailing treatment facility (TTF), located near the region’s Slate Lakes area. The...
Sawmill Creek Road

Sawmill Creek Road

proHNS provided a full construction inspection and contract administration team on AK DOT&PF’s Sawmill Creek Road project, which resurfaced the roadway and made pedestrian improvements between Lake Street and Jeff Davis Street. Our services included...
Gustavus Airport

Gustavus Airport

This FAA-funded project addressed multiple safety concerns by resurfacing and rehabilitating the existing taxiways, aprons, and runways. It was one of the first projects in Alaska to bid with the new Standard Specifications for Airport Construction, which are based on...
Calhoun Avenue

Calhoun Avenue

Calhoun Avenue is a historic road in Alaska’s capital city that connects downtown Juneau to the state’s Governor’s Mansion and continues to recreational parks and residential neighborhoods. proHNS planned this road reconstruction project into two phases, spread out...
Douglas 4th Street

Douglas 4th Street

proHNS deftly designed this complicated utility and drainage  improvement project, which will replace multiple underground water transmission and distribution pipe networks with new 10” and 14” HDPE pipe, water services, and hydrants. Work will also include...
North Tongass Bridges

North Tongass Bridges

This federally funded project removed and replaced the first Waterfall Creek Bridge (#0414) and Second Waterfall Creek Bridge (#0415), regraded and repaved bridge approaches, improved drainage, relocated utilities, and installed new guardrails and signs. proHNS...
Airport Creek Bridge

Airport Creek Bridge

This FHWA-funded AK DOT&PF project replaced an existing temporary bridge structure across Airport Creek on Lewis Reef Road with a new, two-lane concrete bulb tee girder bridge with a finished width of 39 feet. Improvements included realignment of Lewis Reef Road...
King Salmon Airport

King Salmon Airport

This FAA-funded project will remove the main runway’s existing pavement to full depth and replace it with four inches of hot mix asphalt on a six-inch stabilized foamed asphalt base. With an office engineer and two grade/paving inspectors working on this project, the...
Front/Mill/Stedman Streets

Front/Mill/Stedman Streets

For this multi-street project, our Materials Testing Technician tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory. They also performed construction inspection duties, filling out daily reports and coordinating directly...
Haines Airport

Haines Airport

Working on behalf of the contractor, proHNS staff provided construction management services for this AK DOT&PF project that rehabilitated the general aviation apron, two taxiways, the airport access road, and several airport lease lots. Roles we filled for the...
Egan Drive 10th to Main

Egan Drive 10th to Main

proHNS provided a full team of experienced Project Engineers, Office Engineers, and Engineering Technicians to provide contract administration and inspection services for this high-profile, logistically challenging road improvement project in downtown Juneau. The...
Tenakee Ferry Terminal

Tenakee Ferry Terminal

proHNS provided a full team to perform contract administration and inspection services for all work on this $11.2 million project that reconstructed the existing Tenakee city dock and DOT&PF ferry terminal facility. Construction included removal of portions of the...