Juneau Office: (907) 780-4004
Portage Cove Waterfront Trail

Portage Cove Waterfront Trail

Location: Haines, AK Project Date: 2019 Owner: Haines Borough proHNS is currently designing three sections of the six-segment Portage Cove Waterfront Trail. The type of site-specific trail improvements will be determined during design and through coordination with...
Lee Street Pump Station Replacement

Lee Street Pump Station Replacement

Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau As the prime consultant, proHNS is providing civil engineering design for this CBJ project that will upgrade an existing pump station to maintain operating pressure and provide fire flow...
Staff Engineer Chris Bydlon joins Juneau office

Staff Engineer Chris Bydlon joins Juneau office

We are proud to announce the addition of Staff Engineer Chris Bydlon to the proHNS team as part of our ongoing effort to offer quality services and meet the demands of a growing project portfolio. A longtime Alaskan, Chris grew up in the Mat-Su Valley and obtained his...

King Salmon Airport Pavement Rehabilitation

Location: King Salmon, AK Project Dates: 2018 Owner: AK DOT&PF The ongoing FAA-funded project will remove the main runway’s existing pavement to full depth and replace it with four inches of hot mix asphalt on a six-inch stabilized foamed asphalt base. With an...

Front/Mill/Stedman Street Improvements

Location: Ketchikan, AK Project Dates: 2018 Owner: AK DOT&PF For this multi-street project, our Materials Testing Technician tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory. They also performed construction...

Evergreen Road Improvements

Location: Wrangell, AK Project Dates: 2018 Owner: AK DOT&PF proHNS provided office engineering and materials testing for this project that constructed a sidewalk along the ocean side of Evergreen Road and rehabilitated the existing asphalt pavement. Specific work...
Pelican Main Street Bridge Improvements

Pelican Main Street Bridge Improvements

Location: Pelican, AK Project Dates: 2018 – 2019 Owner: AK DOT&PF This FHWA-funded project rehabilitated the famous Pelican Boardwalk, replacing dilapidated timber stringers, caps, and cross braces. The project also replaced several timber piles and repaired...
Introducing our new Haines Office Manager

Introducing our new Haines Office Manager

proHNS is pleased to announce that our Creative Director Karen Garcia has assumed the position of Haines Office Manager as of July 16, 2018 and will be the company’s new primary point of contact in the Upper Lynn Canal. “I’m excited – and a little apprehensive – about...
Spaulding Beach Parking Lot Reconstruction

Spaulding Beach Parking Lot Reconstruction

Location: Juneau, AK Project Dates: 2018 Owner: Spaulding Beach Homeowners Association proHNS provided contract administration and inspection services on behalf of the Spaulding Beach Homeowners Association for this $240,000 parking lot reconstruction project. Our...
Sitka Street Reconstruction

Sitka Street Reconstruction

Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau proHNS handled primary engineering design, research, analysis, and technical specification writing for this City and Borough of Juneau project that replaced Sitka Street’s...
proHNS welcomes new Staff Engineer Travis Eckhoff

proHNS welcomes new Staff Engineer Travis Eckhoff

Staff Engineer Travis Eckhoff, PE, is the newest addition to the growing proHNS team. Before joining proHNS, Travis occupied several roles with the Alaska Department of Transportation and Public Facilities, including as Assistant Project Engineer for Southcoast...