![2020 Area Wide Paving](https://prohns.com/wp-content/uploads/2021/07/Areawide-Paving-Smaller-scaled-e1632368894179-903x675.jpg)
![2020 Area Wide Paving](https://prohns.com/wp-content/uploads/2021/07/Areawide-Paving-Smaller-scaled-e1632368894179-903x675.jpg)
![Douglas 4th Street Utilities and Drainage](https://prohns.com/wp-content/uploads/2021/07/Chris-in-Culvert-4th-Avenue-Douglas-Smaller-e1626463217255.jpg)
Douglas 4th Street Utilities and Drainage
Location: Juneau, AK Project Dates: 2020 – Present Owner: City and Borough of Juneau proHNS deftly designed this complicated utility and drainage improvement project, which will replace multiple underground water transmission and distribution pipe networks with...![Calvary Fellowship Subdivision](https://prohns.com/wp-content/uploads/2019/05/Calvary-Fellowship-Subdivision-Juneau-proHNS-Design-Inspection.jpg)
Calvary Fellowship Subdivision
Location: Juneau, AK Project Dates: 2017-2019 Owner: Southeast Endeavors proHNS designed this 8-lot subdivision on behalf of Southeast Endeavors, and subsequently provided construction inspection services under our three-year CBJ term agreement. Our Lead Designer...![Sitka Street Reconstruction](https://prohns.com/wp-content/uploads/2018/05/Sitka-Street-Reconstruction-Contract-Administration-Inspection-proHNS-Juneau-CBJ-e1632881049732.jpg)
Sitka Street Reconstruction
Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau proHNS handled primary engineering design, research, analysis, and technical specification writing for this City and Borough of Juneau project that replaced Sitka Street’s...![Merritt Subdivision](https://prohns.com/wp-content/uploads/2018/01/Merritt-Subdivision-Construction-Inspection-proHNS-1.jpg)
Merritt Subdivision
Location: Juneau, AK Project Dates: 2017-Present Owner: Creative Development, Inc. To ensure City and Borough of Juneau development standards are met, proHNS is performing on-site construction inspection on behalf of a private developer for this 13-lot subdivision...![Glacier Highway Reconstruction](https://prohns.com/wp-content/uploads/2017/10/CBJ-Glacier-Highway-Reconstruction-Fritz-to-Seaview.jpg)
Glacier Highway Reconstruction
Location: Juneau, AK Project Date: 2017-2018 Owner: City and Borough of Juneau This ADOT project reconstructed a high-volume section of Glacier Highway between Fritz Cove Road and Seaview Avenue and involved relocation of City and Borough of Juneau (CBJ) owned water...![Glacier Highway Reconstruction](https://prohns.com/wp-content/uploads/2017/10/CBJ-Glacier-Highway-Reconstruction-Fritz-to-Seaview.jpg)
![Glacier Highway Reconstruction](https://prohns.com/wp-content/uploads/2017/10/CBJ-Glacier-Highway-Reconstruction-Fritz-to-Seaview.jpg)
![Glacier Highway Reconstruction](https://prohns.com/wp-content/uploads/2017/10/CBJ-Glacier-Highway-Reconstruction-Fritz-to-Seaview.jpg)