


Tenakee Ferry Terminal Improvements
Location: Tenakee Springs, AK Project Dates: 2020 Owner: AK DOT&PF proHNS provided a full team to perform contract administration and inspection services for all work on this $11.2 million project that reconstructed the existing Tenakee city dock and DOT&PF...
North Tongass Bridge Improvements – Waterfall Creeks
Location: Ketchikan, AK Project Dates: 2019 Owner: AK DOT&PF This federally funded project removed and replaced the first Waterfall Creek Bridge (#0414) and Second Waterfall Creek Bridge (#0415), regraded and repaved bridge approaches, improved drainage, relocated...
Ketchikan Airport Creek Bridge Replacement
Location: Ketchikan, AK Project Dates: 2019 Owner: AK DOT&PF This FHWA-funded AK DOT&PF project replaced an existing temporary bridge structure across Airport Creek on Lewis Reef Road with a new, two-lane concrete bulb tee girder bridge with a finished width...
proHNS partners with AK DOT&PF on Juneau’s Egan Drive Improvements
We are excited to announce proHNS will be providing Contract Administration and Inspection services for the Alaska Department of Transportation’s Egan Drive 10th to Main Street Improvements in the heart of downtown Juneau. Contractor SECON plans to break ground...Front/Mill/Stedman Street Improvements
Location: Ketchikan, AK Project Dates: 2018 Owner: AK DOT&PF For this multi-street project, our Materials Testing Technician tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory. They also performed construction...Evergreen Road Improvements
Location: Wrangell, AK Project Dates: 2018 Owner: AK DOT&PF proHNS provided office engineering and materials testing for this project that constructed a sidewalk along the ocean side of Evergreen Road and rehabilitated the existing asphalt pavement. Specific work...
Pelican Main Street Bridge Improvements
Location: Pelican, AK Project Dates: 2018 – 2019 Owner: AK DOT&PF This FHWA-funded project rehabilitated the famous Pelican Boardwalk, replacing dilapidated timber stringers, caps, and cross braces. The project also replaced several timber piles and repaired...