Location: Ketchikan, AK
Project Dates: 2019
Owner: AK DOT&PF
This federally funded project removed and replaced the first Waterfall Creek Bridge (#0414) and Second Waterfall Creek Bridge (#0415), regraded and repaved bridge approaches, improved drainage, relocated utilities, and installed new guardrails and signs. proHNS Engineering Technicians tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory, and simultaneously performed construction inspection duties.