proHNS assigned an experienced Materials Testing Technician to this project, which constructed two roundabouts intersecting Mendenhall Loop Road at Steven Richards Memorial Drive and Floyd Dryden to increase traffic capacity. It also reconstructed the separated multi-use pedestrian pathways adjacent to the intersection improvements and extended the culvert at Duck Creek under Steven Richards Memorial Drive. The Materials Testing Technician, using a DOT-owned and equipped mobile lab, conducted all materials sampling and testing (aggregates, concrete, asphalt) and performed minor inspection tasks to ensure construction was in conformance with the contract plans, specifications, and FHWA requirements.
Mendenhall Loop Roundabouts