Location: Haines, AK Project Dates: 2019-2020 Owner: Haines Borough proHNS designed this Haines Borough project that replaced 2,891 feet of asbestos and ductile iron water line with HDPE pipe. In addition to installing a new water main, sewer services, water services,...
Location: Haines, AK Project Date: 2019 Owner: Haines Borough proHNS is currently designing three sections of the six-segment Portage Cove Waterfront Trail. The type of site-specific trail improvements will be determined during design and through coordination with...
Location: Haines, AK Project Date: 2017-2018 Owner: Haines Borough For this Haines Borough project, our construction administration services include on-site civil inspection and marine mammal monitoring. The $14 million project involves expanding the parking area...
Location: Haines, AK Project Date: 2016-2017 Owner: Chilkat Valley Preschool/Haines Borough proHNS provided project management, civil design, drafting, and permitting support for this addition to the Haines Senior Center, which will create a new space for the...
Location: Haines, AK Project Date: 2016 Owner: Haines Borough For this Haines Borough water supply project, proHNS staff designed a new impermeable roof membrane system to replace the failing timber and shingle roof. A major component of our work was review and...
proHNS is pleased to announce we will be providing on-site civil inspection and marine mammal observation services for the Small Boat Harbor Expansion Project in Haines. “We are excited to provide local expertise to this significant community project, and to...
Location: Haines, AK Project Date: 2016-2017 Owner: Haines Borough proHNS designed and prepared construction plans to extend drinking water service from FAA Road to the end of Bear Trail Lane. Originally scoped to reach only two residential lots, proHNS redesigned the...