2020 Area Wide Paving

Location: Juneau, AK Project Complete: 2021 Owner: City and Borough of Juneau proHNS managed and inspected this project that made varying levels of improvement to seven CBJ roadways. We successfully worked around the Contractor’s irregular, unpredictable schedule of paving one street at a time as “fill-in” jobs between other projects. Our inspector navigated the different challenges presented by each roadway, including working with the paving Contractor to ensure a clean, smooth radius that...
Read More

Richland Manor Subdivision

Location: Juneau, AK Project Dates: 2020 – Present Owner: Private proHNS designed the first phase of this residential subdivision development, which constructed a 1,000-foot access road and sewer main from Hooter Lane to the project site. Our Engineer also calculated the capacity of the existing AK DOT&PF-owned drainage system on Glacier Highway at the bottom of Hooter Lane, the runoff of the existing drainage basin encompassing the location of the proposed development, and the runoff i...
Read More

Douglas 4th Street Douglas Utilities and Drainage

Location: Juneau, AK Project Dates: 2020 - Present Owner: City and Borough of Juneau proHNS deftly designed this complicated utility and drainage  improvement project, which will replace multiple underground water transmission and distribution pipe networks with new 10” and 14” HDPE pipe, water services, and hydrants. Work will also include installation of temporary water systems to maintain service to the high pressure transmission network between PRVs, and temporary water systems to maint...
Read More

Tenakee Ferry Terminal Improvements

Location: Tenakee Springs, AK Project Dates: 2020 Owner: AK DOT&PF proHNS provided a full team to perform contract administration and inspection services for all work on this $11.2 million project that reconstructed the existing Tenakee city dock and DOT&PF ferry terminal facility. Construction included removal of portions of the existing dock and terminal structures, refurbishment of the existing pile support approach deck, improvements to fuel and electrical systems, and constru...
Read More

North Tongass Bridge Improvements – Waterfall Creeks

Location: Ketchikan, AK Project Dates: 2019 Owner: AK DOT&PF This federally funded project removed and replaced the first Waterfall Creek Bridge (#0414) and Second Waterfall Creek Bridge (#0415), regraded and repaved bridge approaches, improved drainage, relocated utilities, and installed new guardrails and signs. proHNS Engineering Technicians tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory, and simultaneously performed constructio...
Read More

Ketchikan Airport Creek Bridge Replacement

Location: Ketchikan, AK Project Dates: 2019 Owner: AK DOT&PF This FHWA-funded AK DOT&PF project replaced an existing temporary bridge structure across Airport Creek on Lewis Reef Road with a new, two-lane concrete bulb tee girder bridge with a finished width of 39 feet. Improvements included realignment of Lewis Reef Road and modifying the approach intersection of Bostwick/Seely Road. The concrete bridge abutments were Cast-In-Place (CIP) atop steel H-piles rock socketed into be...
Read More

Small Tracts/Mud Bay/Third Avenue AC Pipe Replacement

Location: Haines, AK Project Dates: 2019-2020 Owner: Haines Borough proHNS designed this Haines Borough project that replaced 2,891 feet of asbestos and ductile iron water line with HDPE pipe. In addition to installing a new water main, sewer services, water services, hydrants, and valves, the project also replaced the road base and pavement. proHNS also provided contract administration and inspection services during the three-month construction season. As the project was partially fund...
Read More

Egan Drive 10th Street to Main Street Improvements

Location: Juneau, AK Project Dates: 2019-Present Owner: AK DOT&PF proHNS is providing a team of experienced Project Engineers, Office Engineers, and Engineering Technicians to provide contract administration and inspection services for this high-profile, logistically challenging road improvement project in downtown Juneau. The 2019 construction season is focusing on the highly trafficked stretch of Egan Drive between Willoughby and Whittier Streets, necessitating complex coordinatio...
Read More

Calvary Fellowship Subdivision

Location: Juneau, AK Project Dates: 2017-2019 Owner: Southeast Endeavors proHNS designed this 8-lot subdivision on behalf of Southeast Endeavors, and subsequently provided construction inspection services under our three-year CBJ term agreement. Our Lead Designer Lucas Chambers worked on this project from start to finish. Beginning in 2017, Lucas designed and modeled the new road, lot layout, driveways, and water and sewer facilities servicing the new lots. He also designed an extension...
Read More

Front Street Water Line Replacement

Location: Haines, AK Project Dates: 2019 Owner: Haines Borough This project, funded by an Alaska Department of Environmental Conservation Drinking Water Fund loan, replaced 420 linear feet of existing 4-inch diameter asbestos cement (AC) water line with HDPE pipe. Our subcontractor North 57 Land Surveying provided survey while we handled project design, elements of which included replacement of residential water services, water line valves, hydrants, and other system features. We also d...
Read More