Juneau Office: (907) 780-4004

Redfish Lake to Stanley Trail

This WFLHD project constructed a 4.5-mile-long, 78-inch-wide gravel trail with water diversion features such as culverts, grade reversals, and reversed grade dips. The project also reconstructed existing trailheads and trails, eliminated existing service roads, and installed gates, cattle guards, fences, and signs. Under our IDIQ contract with WFLHD, proHNS brought on a fill-in Project Engineer toward the end of the project to assist with closeout and review of contract documents for accuracy, content, and completeness.