proHNS managed and inspected this project that made varying levels of improvement to seven CBJ roadways. We successfully worked around the Contractor’s irregular, unpredictable schedule of paving one street at a time as “fill-in” jobs between other projects. Our inspector navigated the different challenges presented by each roadway, including working with the paving Contractor to ensure a clean, smooth radius that tied into existing driveways on Mark Alan Street. On Behrends Avenue, a tightly constructed residential neighborhood with frequent driveways and on-street parking, we performed neighborhood outreach and assisted with implementation of traffic control and paving plans
2020 Area Wide Paving