Juneau Office: (907) 780-4004
2020 Area Wide Paving

2020 Area Wide Paving

Location: Juneau, AK Project Complete: 2021 Owner: City and Borough of Juneau proHNS managed and inspected this project that made varying levels of improvement to seven CBJ roadways. We successfully worked around the Contractor’s irregular, unpredictable schedule of...
Richland Manor Subdivision

Richland Manor Subdivision

Location: Juneau, AK Project Dates: 2020 – Present Owner: Private proHNS designed the first phase of this residential subdivision development, which constructed a 1,000-foot access road and sewer main from Hooter Lane to the project site. Our Engineer also calculated...
Douglas 4th Street Utilities and Drainage

Douglas 4th Street Utilities and Drainage

Location: Juneau, AK Project Dates: 2020 – Present Owner: City and Borough of Juneau proHNS deftly designed this complicated utility and drainage  improvement project, which will replace multiple underground water transmission and distribution pipe networks with...
Calvary Fellowship Subdivision

Calvary Fellowship Subdivision

Location: Juneau, AK Project Dates: 2017-2019 Owner: Southeast Endeavors proHNS designed this 8-lot subdivision on behalf of Southeast Endeavors, and subsequently provided construction inspection services under our three-year CBJ term agreement. Our Lead Designer...
Lee Street Pump Station Replacement

Lee Street Pump Station Replacement

Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau As the prime consultant, proHNS is providing civil engineering design for this CBJ project that will upgrade an existing pump station to maintain operating pressure and provide fire flow...
Sitka Street Reconstruction

Sitka Street Reconstruction

Location: Juneau, AK Project Dates: 2018-2019 Owner: City and Borough of Juneau proHNS handled primary engineering design, research, analysis, and technical specification writing for this City and Borough of Juneau project that replaced Sitka Street’s...
Merritt Subdivision

Merritt Subdivision

  Location: Juneau, AK Project Dates: 2017-Present Owner: Creative Development, Inc. To ensure City and Borough of Juneau development standards are met, proHNS is performing on-site construction inspection on behalf of a private developer for this 13-lot subdivision...
Glacier Highway Reconstruction

Glacier Highway Reconstruction

Location: Juneau, AK Project Date: 2017-2018 Owner: City and Borough of Juneau This ADOT project reconstructed a high-volume section of Glacier Highway between Fritz Cove Road and Seaview Avenue and involved relocation of City and Borough of Juneau (CBJ) owned water...
Glacier Highway Reconstruction

Keeping busy on both ends of the Lynn Canal

Though Southeast Alaska is nearing the end of summer, the construction season is still going strong and keeping proHNS staff busy in both Haines and Juneau. At the northern end of the Lynn Canal, we’re wrapping up our contract administration work on the State of...
Front Street Douglas

Front Street Douglas

  Location: Juneau, AK Project Date: 2016 Owner: City and Borough of Juneau Constructed by Glacier State Contractors, this project involved two city blocks of full-width street reconstruction, replacement of the roadway structural section, curb and gutter, a new...