Juneau Office: (907) 780-4004

King Salmon Airport Pavement Rehabilitation

Location: King Salmon, AK Project Dates: 2018 Owner: AK DOT&PF The ongoing FAA-funded project will remove the main runway’s existing pavement to full depth and replace it with four inches of hot mix asphalt on a six-inch stabilized foamed asphalt base. With an...

Front/Mill/Stedman Street Improvements

Location: Ketchikan, AK Project Dates: 2018 Owner: AK DOT&PF For this multi-street project, our Materials Testing Technician tested aggregates, concrete, and asphalt paving both in the field and in the DOT&PF laboratory. They also performed construction...

Evergreen Road Improvements

Location: Wrangell, AK Project Dates: 2018 Owner: AK DOT&PF proHNS provided office engineering and materials testing for this project that constructed a sidewalk along the ocean side of Evergreen Road and rehabilitated the existing asphalt pavement. Specific work...
Pelican Main Street Bridge Improvements

Pelican Main Street Bridge Improvements

Location: Pelican, AK Project Dates: 2018 – 2019 Owner: AK DOT&PF This FHWA-funded project rehabilitated the famous Pelican Boardwalk, replacing dilapidated timber stringers, caps, and cross braces. The project also replaced several timber piles and repaired...