Jeremy was very prompt and thorough in preparing the Energy rating engineering report for our new house. I would have no hesitation recommending proHNS.
Location: Haines, AK Project Date: 2016-2017 Owner: Alaska Department of Transportation and Public Facilities This bridge replacement construction project is currently under way with construction management performed by proHNS. The site is located 26 miles northwest...
Location: Haines, AK Project Date: 2015-2017 Owner: Highland Estates, Inc. proHNS managed design of the Skyline and Hill Top subdivisions for the Haines-based company Highland Estates, Inc. The Hill Top Subdivision includes 35 acres near downtown Haines to be...
Location: Juneau, AK Project Date: 2016 Owner: City and Borough of Juneau This $1.4 million community improvement project consisted of numerous park upgrades including new playground equipment, two tennis courts, bocce court, picnic areas, asphalt paving, and utility...
Location: Haines, AK Project Date: 2016-2017 Owner: Haines Borough proHNS designed and prepared construction plans to extend drinking water service from FAA Road to the end of Bear Trail Lane. Originally scoped to reach only two residential lots, proHNS redesigned the...